A fault report turned into a planned job. The permit stays with the person who isolates.
The agent reads the asset history, opens the work order with its procedure and parts, and proposes the shutdown window. Your maintenance supervisor releases the job. The agent never signs an isolation or a permit.
DesignedThe steps and approvals are designed. It has not run yet.
A decade in defence and aerospace. In government procurement since 2016. The same technology since 2019, validated in US DoD and Canadian DND programs.
An AI agent for maintenance work orders does the planning paperwork between a fault and a technician on site. An operator reports a fault. Someone looks up the asset, finds the last repair, pulls the procedure, checks the parts, agrees a window with operations and writes the job up. The technician needs all of it before the first tool comes out.
This workflow is designed. The steps below are how we build it in a pilot. It has not run in the sandbox yet.
What the maintenance supervisor gets
- A work order with the procedure, the isolation points, the parts and the trade already on it.
- The asset history beside it: earlier faults and the last repair on the same asset.
- One decision to make: release the job, with the asset out of service for the window proposed.
The agent works in the business systems around the job. Control systems and the equipment stay outside its permission. The energy page shows the inspection side of the same work, and the full library is on the workflows page.
One fault report, from the operator to the closed work order.
The asset, the fault and the parts are examples. The approval is the shutdown window. The refusal is the permit, which only a person may sign.
- 01Ticketing
Take the fault report raised by the operator and receive a credential for this asset and this work order only.
- Who approves
- No approval on this step
- On the record
- credential issued · one asset, one work order
- 02ERP
Read the asset history: earlier faults, open work orders and the last repair.
- Who approves
- No approval on this step
- On the record
- read-asset-history · allowed
- 03Documents
Read the maintenance procedure and the isolation points for this asset.
- Who approves
- No approval on this step
- On the record
- read-procedure · allowed
- 04ERP
Open the work order with the tasks, the procedure, the parts list and the trade the job needs.
- Who approves
- No approval on this step
- On the record
- open-work-order · allowed
- 05ERP
Reserve the spare parts in stock against the work order.
- Who approves
- No approval on this step
- On the record
- reserve-parts · allowed
- 06In-house tool
Try to mark the isolation as done on the permit so the job can start sooner. The permit belongs to the authorised person who isolates the equipment, so the step is refused.
- Who approves
- No approval on this step
- On the record
- sign-isolation · refused · permit is for the authorised person
- 07ERP
Release the work order to the schedule, with the asset out of service for the proposed window. The step waits until the maintenance supervisor approves it.
- Who approves
- Maintenance supervisor
- On the record
- release-work-order · approved by maintenance supervisor
- 08Email
Draft the notice to the operations shift that the asset will be out of service.
- Who approves
- No approval on this step
- On the record
- notify-shift · allowed
- 09ERP
After the technician records the work and signs it off, close the work order with the parts used.
- Who approves
- No approval on this step
- On the record
- close-work-order · allowed · after technician sign-off
The systems, by type
We name systems by type. Yours are named in the assessment.
Ticketing
Holds the fault reports operators raise. The agent takes one report per job.
ERP
Your maintenance module: assets, work orders and spare parts. The agent opens, reserves and closes there.
Documents
Holds the procedures and isolation points. The agent reads them and attaches them to the job.
In-house tool
Your permit system. The agent may read a permit and its state. It may not write to one.
Carries the out-of-service notice to the operations shift.
The approval, the refusal, the record
- A person approves: Release the work order to the schedule, with the asset out of service for the proposed window. The step waits until the maintenance supervisor approves it.Taking an asset out of service moves production and people, so the supervisor who plans the shift approves the window before the job is released.
- Refused: Try to mark the isolation as done on the permit so the job can start sooner. The permit belongs to the authorised person who isolates the equipment, so the step is refused.A permit says that a person isolated the equipment and checked it, which an agent cannot have done, so the job may read a permit but never sign one.
- On the recordThe report, the history and procedure read, the work order and the parts reserved, the refused permit entry with its reason, the release with the supervisor’s name, and the close after sign-off.
What goes on the record
- credential issued · one asset, one work order
- read-asset-history · allowed
- read-procedure · allowed
- open-work-order · allowed
- reserve-parts · allowed
- release-work-order · approved by maintenance supervisor
- notify-shift · allowed
- close-work-order · allowed · after technician sign-off
One record per step, as designed. This workflow has not run yet.
What it does not do
- It does not touch control systems or the equipment. It works in the business systems around the job.
- It does not sign a permit, an isolation or a safety check.
- It does not diagnose the fault. Your technicians do, with the history the agent gathers.